Job Site Trailer Rental Setup Checklist: From Groundbreaking to the First Shift
Everything a superintendent should line up before the first crew arrives: the site office, restrooms, handwashing, water, power, and the truck route.

Key points
- Pick a level, firm spot with a clear truck route.
- Size restrooms by OSHA 1926.51.
- Plan power and water before delivery day.
The first week on a new site sets the tone. Line up these items before the first shift.
1. Site office
The Office, Sleeper and Shower & Restroom Trailer gives the superintendent an office, a sleeping room, and a shower-restroom in one unit.
2. Restrooms
OSHA 1926.51 Table D-1 calls for one toilet where there are 20 or fewer workers, then one seat and one urinal per 40. A Restroom Trailer covers most early-phase crews, Price by quote.
3. Handwashing and water
Add a Handwashing Sink Trailer near break areas and a Water Tank where there is no line yet.
4. Power and access
Plan a temporary power drop or a generator, and keep the truck route clear for delivery and servicing.
5. Crew housing
If crews stay overnight, add bunk bed trailer units such as the 20ft Accommodation (Contractor).
Sources
- OSHA 1926.51: Sanitation (construction): Table D-1: one toilet for 20 or fewer workers; one toilet seat and one urinal per 40 workers above that.
Links checked 2026-11-20. Figures quoted above appear on the linked pages.